Related links

Swap Feeder Check

 

Related links
 

Purpose : to verify intalation mistake on feeder cable to BTS

1. Lock BCCH ARFCN each sector : Click Toolbar Lock on Channel swap-lockicon (ie. BCCH Sect 1 = 547, Sect 2 = 540, Sect 3 = 543 )

swap-lock

2. Set HO Target : Equipment Properties -> Dedicated Mode -> Function -> Target HO (ie. BCCH 547, 540, 543)

swap-mobprop

3. Create drive route that can represent each sector

4. Export logfile into *.tab with IEs CI

5. Create thematic map for each CI (Cell Identity)

swap-result

Picture above indicate swap feeder between sector 2 and 3.

 

 

Sumber : orinaica-wordpress

 

Related Links

Back to Drive Test Menu

 

HOME :: BIMBINGAN TUGAS AKHIR :: ARTIKEL TEKNOLOGI :: ARTIKEL LAINNYA :: LINK PENTING :: BUKU TAMU

Copyright © 2008 Sinau Online.